Critical Path
Questions related to the Critical Path section of the Backoffice
14 articles
- What is a critical path?A critical path defines the tasks, target timings, and operational sequence for a turnaround operation.
- How do I request a new field or a change to my AGOA setup?New fields (additional information), task changes and Analytics updates are set up by our support team. Send us the details and the change is available from the next flights.
- How do I add or remove additional information on a task in my critical path?In the Backoffice, open the critical path, open More Parameters on the task, then add a line with an existing additional information label, or click X to remove one, and…
- What is a default critical path?A default critical path is used when no aircraft-specific critical path is available.
- What is a specific critical path?You can use a specific critical path that applies in certain conditions
- What does above and below the wing mean?"Above the Wing" and "Below the Wing" refer to the physical location on the aircraft where a task is performed. They are also used to organize and filter tasks within…
- What is an end-only task?An end-only task records a single event time instead of a start and end time.
- What do A+ and D- mean?A+/- and D+/- define when a task should start or finish relative to the flight's Arrival (A) or Departure (D).
- What is a task owner?A task owner is the company that owns a task and determines who can edit it in Backoffice.
- What is additional information?Additional information allows you to capture extra data during a turnaround, beyond the standard task timings.
- What is a custom label and how can I use it?Custom labels let you display task information using terms that are familiar to your operation, while keeping the same underlying AGOA data.
- My task timings always have the same value — what does this mean?A single label can be linked to multiple task timings. When the same label is used across different tasks or sub-tasks, they will always display the same recorded value.
- I cannot find the task name I need when creating a critical path — what should I do?If you cannot find the task you need, check both task lists and try searching for alternative names or synonyms.
- How can I copy a critical path?You can copy an existing critical path to another airport or aircraft model.