Skip to main content

What is a default critical path?

A default critical path is used when no aircraft-specific critical path is available.

Every critical path is defined by three things:

  • Airline

  • Airport

  • Aircraft type

If a flight matches an airline and airport that have a configured critical path, but no critical path exists for its aircraft type, AGOA applies the default critical path for that airline and airport.

This lets several aircraft types that follow the same turnaround process share one configuration, so you don't have to create and maintain a separate critical path for each aircraft type.

A default critical path is identified by a checkmark:

Did this answer your question?