What is a default critical path?

Modified on Mon, 10 Oct, 2022 at 11:07 AM

When a turnaround is created in the system, the critical path will be selected using the aircraft type, route-specific critical paths excluded.

If the aircraft type is not found in the list of critical paths at that station, the default critical path will be applied.


To make a critical path the default one, click on the Default toggle when creating or editing a critical path.

The toggle will be pre-selected when creating a new critical path from scratch, and will not when duplicating one or creating a route-specific one.